Duro Felguera | Cotización

Mining & Handling

Reference projects

Sodium carbonate transport plant

Puerto Abierto SA

Chile

Year: 2022

Bulk solids transport project in Mejillones Bay (Antofagasta region, Chile). EPC contract for the Soda Ash project, consisting of the construction of a new facility for transporting sodium carbonate material from the port terminal to the storage facilities, where it is subsequently dispatched to a truck loading station.

The scope of the contract covers basic and detailed engineering, procurement, transport, civil works, electromechanical assembly, testing, operator training and spare parts for 2 years. The equipment includes conveyor belts, storage system by tents and auxiliary systems (fire protection, dust collection, measuring scales, etc.).