Optimisation of the design of new solutions for hydrocarbon processing plants

The main goal of Duro Felguera Plantas Industriales’ project is to develop the appropriate technology required to install a regasification plant, with the purpose of reducing the construction times and execution and operating costs, while significantly minimising the space required by the plant, demonstrating the viability of the project.

With this new design, Duro Felguera will develop the technologies and procedures required to build an offshore regasification plant that can be commissioned in less than 16 months at a lower cost, thanks to the optimisation of the cryogenic facility.