Duro Felguera | Cotización

Conventional Energy

Reference projects

Vuelta de Obligado Combined Cycle Power Plant (800 MW)

Fideicomiso Vuelta de Obligado, S.A.

Timbúes, Rosario, Santa Fe. Argentina

  • CC 2×1 800 MW. (1) STAG 209FA
  • Contract Type: EPC Consortium with GE
  • Scope of Work: Plant Design, BOP and Basic and Detail Engineering, BOP Equipment Supply, Substation and Interconnection with the Grid, Civil Works, Start-up and Commissioning. Puesta en Marcha.