- Detail engineering, part of the civil works. Manufacturing of the boilers, balance equipment of the plant, electrical-mechanical erection, assistance at start-up for 4 electrical groups – combined cycle – with a total capacity of 1,600 MW. DF is ABBs main contractor for these 4 power plants. This project is the most important one which has ever been developed by Spanish energy groups in the area of power plant construction.