Terminal for Coal Unloading and Storage

ENDESA GENERACIÓN

Puerto Cabo Prioriño, El Ferrol. España

  • 2 Grab Shipunloaders – 54 t.
  • 1 Stacker for Coal Stacking. Capacity: 5,400 tph.
  • 1 Water Processing Plant. Re-running Water System. Belt Conveyor System 5,4000 tph coal. B = 1,800 mm.
  • Trucks Weighing. Fire-fighting system. Dust Collection System.
  • Pile Spraying System. Trucks washing system.
  • Offices buildings. Workshop storehouse. Electric Sub-station.