New materials handling system for iron ore integrated with the existing plant:
- One (1) stacker 2,500 tph.
- One (1)stacker 1,000 tph.
- One (1) bucket wheel reclaimer 2,500 tph.
- One (1) bucket wheel reclaimer 1,000 tph.
- Twenty three (23) belt conveyors BW 1200 mm.
- Six (6) intermediate hoppers.
- Transfer towers and crushing & screening buildings.
- Auxiliary equip.
- New electrical and control systems.