EPC construction of 3 storage tanks for gasoline (16,000 m3), diesel (56,000 m3) and bunker (16,000 m3). Civil works, connecting piping, electrical equipment and material, I&C, fire prevention systems, hydrocarbon pumping system, dikes and other auxiliary systems.